Why you need a basic engineering data document

Feb. 21, 2014
BEDD establishes the ground rules for your plant.

"What's the temperature range on your cooling water?" I asked. A shrug was his reply. "What's the water quality for your boilers?" was my second question. This prompted another shrug. I got the answers I needed from his vendors but was embarrassed for him, even if he wasn't.

My young client needed a basic engineering data document (BEDD). It should have been in the first document he handed me. A BEDD should be developed during the initial design of a plant and updated periodically during commissioning, construction and operation of the plant. In short, a BEDD establishes the ground rules.

Don't confuse a BEDD with basic engineering data (BED), which is specific to a particular project, although it should excerpt parts of the BEDD.

Read the whole story on Chemical Processing

Sponsored Recommendations

Jan. 22, 2025
Discover how INNOMAG® is transforming pump selection with innovative design and unparalleled performance. Learn how this breakthrough solution simplifies operations, enhances ...
Jan. 14, 2025
Struggling with a troublesome pump? Get a reliable solution in just five days with the fastest, most advanced sealless pump on the market.
Jan. 14, 2025
INNOMAG® pumps save energy and maintain peak efficiency over time—no wear and tear. Discover how they can lower your operating costs and increase reliability.
Jan. 14, 2025
Say goodbye to leaks for good. Discover how the hermetically sealed INNOMAG® pump delivers leak-free performance—even under the toughest conditions.