PM Compliance. According to the SMRP Best Practices Guide, PM Compliance is defined as “the percentage of preventive maintenance (PM) and predictive maintenance (PdM) work orders that were completed past the expected date (e.g., overdue) for a given completion date range. The overdue variance is calculated for each work order. It is recommended that results are grouped in ranges of overdue variance (%) and by criticality rank.”
And the objective of this metric is listed as “to capture and trend PM and PdM work order completion information and ensure the assets are being managed according to their criticality.”
There are a few ways to make yourself look good with this metric. First, you can just pencil whip all PMs as soon as they launch out of the system. You will always be green, denoting just how effective your PM program is. The second, easier way is to just create one PM and make sure it gets completed on time, there again showing 100% completion and very effective at making you look good.
Overall Equipment Effectiveness (OEE). According to the SMRP Best Practice Guide, Overall Equipment Effectiveness is defined as: “a measure of equipment or asset performance based on actual availability, performance efficiency, and quality of product or output when the asset is scheduled to operate. OEE is typically expressed as a percentage.”
And the objective of this metric is listed as: “this metric identifies and categorizes major losses or reasons for poor asset performance. It provides the basis for setting improvement priorities and beginning root cause analysis. OEE also fosters cooperation and collaboration between operations, maintenance, and equipment engineering to identify and reduce and/or eliminate the major causes of poor performance. Maintenance alone cannot improve OEE.”
It has been our experience that the performance bucket is always the area lacking due to speed losses and minor stops. The best way to raise your OEE is to do the following:
- Never use the design rate of the equipment. Hide the speed losses behind what we call theoretical max, or just an average that we think the machine can output. This will raise your performance bucket dramatically.
- Next, make everything that you can planned downtime, as planned downtime should not hit your OEE metric.
- Last, make sure your Quality number is always above 100%. If you have sensors that tabulate your quality metric in a Visual Plant System, just have people flag the photoeye at the end of the line a few hundred times to show that you outputted more than is actually possible to produce.
With these tricks, there is no doubt you should hit well over 100% OEE. If you are not over 100%, you are not doing it right!
We will continue next month on sharing these valuable tips on how to make yourself look good through metrics. Hope this helps!
About the Author: The Captain
Captain Unreliability is a satire of the state of the manufacturing industry in ’Merica today and is written by an industry professional known for using humor to get the point across. Stay tuned for more useless advice, and if you have topics you’d like to see covered or questions you’d like The Captain to weigh in on, contact The Captain directly at [email protected] or follow on Twitter @CUnreliability. Also, consider becoming Unreliable today by getting your Captain t-shirt at https://reliabilityx.com/product-category/gear.